Production runbook — T-24 → May 13

The day-by-day execution surface. Every action, gate, and milestone mapped against the USPTO Class 35 SOU filing deadline. Launch window: Wednesday 2026-05-13. Sources: docs/production-dossier-rc01.md (lock canon), public/rc01-deliverables/production-playbook.md (per-SKU spec), state/operator-questions/2026-04-19-decision-pack.md (4 open decisions), state/operator-questions/2026-04-19-vendor-call-list.md (5 Tier-0 calls).

Every item below is either an operator-only action (phone calls, vendor negotiations, registrar moves) or an agent-completable artifact (renders, copy, site deploy, evidence pull). Color-coded pills disambiguate. Gates at the bottom are go/no-go for launch day.

Decisions · Open now

Four operator decisions block agent-completable work. Each has an agent recommendation grounded in canon. See Decisions dashboard → for full evidence.

D1 · SKU-5 art lock

Heritage Patch (Variant A, fake-heritage register, Bode/Kapital trompe-l'œil) vs ê wink (floating circumflex). Inside Option A: woven patch (NY Custom Labels, register-changing) vs DTF execution.

Recommended: Heritage Patch, Variant A · execution method pending NY Custom Labels sample eval T-22

D2 · SKU-2 decoration

Option A (nape-only tonal ê), Option B (nape + side-seam SUMMER), Option C (nape ê + chest-pocket wordmark DTF). Tank is the summer body piece — must hold its weight on first glance.

Recommended: Option C · preserves Always Tee wordmark grammar at smaller scale, single DTF station

D3 · Teaser DNS

Root takeover on revasser.nyc now (disruptive), teaser.revasser.nyc subdomain (non-destructive), or no custom domain until launch (loses pre-launch attention).

Recommended: Subdomain · agent can execute today, apex swap rehearsed for launch morning

D4 · Vendor orders — LA Apparel OVERDUE

LA Apparel 34008GD + 3380GD overdue by 1 day (4-5 day ground shipping eats sample-photo buffer). Shirtmax same-day NYC confirmation. Print Positiv + NY Custom Labels + Noissue by Monday.

Action today: LA Apparel order + Shirtmax call. Agent cannot auto-execute phone calls.

Phased timeline · Today through T-0

Five phases. Each day-cell pulls actions from the decision pack, vendor call-list, and production playbook into a single execution row. Items are tagged by kind: BLOCKER / DECISION / ARTIFACT / GATE / ACTION.

Phase 0 · Unblock Vendor Stack

URGENT
T-24 · Today
2026-04-19 Sun
URGENT
  • BLOCKER LA Apparel order OVERDUE by 1 day — 34008GD + 3380GD
  • BLOCKER Shirtmax NYC confirmation call (AS Colour 5080 + BC 3483 stock)
  • ARTIFACT Commit deck commentary page + production + decisions surfaces to hub
  • DECISION Reconcile SKU-5 art-lock (Heritage Patch Variant A vs ê wink) — Decision 1
T-23
2026-04-20 Mon
URGENT
  • ACTION DM @PRINTPOSITIV on Instagram — SKU-1 wordmark sample on AS Colour 5080
  • ACTION Email hello@apprvlnyc.com — reserve chainstitch slot for one photo-sample piece
  • ACTION newyorkcustomlabels.com $1 sample pack order (1-day arrival for woven patch eval)
  • DECISION Decide SKU-2 decoration direction (C recommended: nape ê + chest wordmark) — Decision 2
T-22
2026-04-21 Tue
URGENT
  • ARTIFACT NY Custom Labels sample pack ARRIVES — eval woven patch capability for SKU-5
  • ACTION DTF Transfers Now quote request for SKUs 3, 4, 5 (soft-hand matte film)
  • DECISION DNS decision — teaser.revasser.nyc subdomain (Option B, recommended) — Decision 3
  • UNBLOCK If decisions 1-3 close: agent re-renders PDP-02, PDP-05 hero composites

Phase 1 · Samples in Hand

ACTIVE
T-21
2026-04-22 Wed
ACTIVE
  • MILESTONE LA Apparel shipment arrives (ground, 4-5 day transit)
  • GATE Print Positiv sample evaluation if IG DM responds (soft-hand discharge test)
  • ACTION Noissue kraft mailer + tissue + stamp order (MOQ 250, timeline to T-3)
  • ARTIFACT SKU-2 DTF artwork file handed off if Decision 2 closed
T-20
2026-04-23 Thu
ACTIVE
  • GATE Shirtmax stock confirm + woven label attach quote
  • ACTION SKU-1 Print Positiv sample order placed (25-unit sample run minimum)
  • ARTIFACT DTF Transfers Now artwork handoff — HP-1, HP-3, Heritage/Wink
T-19
2026-04-24 Fri
ACTIVE
  • GATE All blanks inventory confirmed (LA Apparel + Shirtmax AS 5080 + BC 3483)
  • ARTIFACT Vendor quotes consolidate into unit-economics matrix (COGS table populated)
  • DECISION Photography pre-shoot composite review — which SKUs need re-shoot vs placeholder
T-18 · T-17 · T-16
2026-04-25 Sat — 2026-04-27 Mon
ACTIVE
  • ARTIFACT Sample DTF transfer runs — HP-1, HP-3, Heritage Patch (if not woven) on 5080
  • GATE 30-wash durability test starts on DTF samples (edge lift + crack monitoring)
  • ARTIFACT APPRVL NYC chainstitch slot — single hero photo-sample piece

Phase 2 · Photography + Production Run

ACTIVE
T-15
2026-04-28 Tue
ACTIVE
  • GATE Photography composite re-shoot planning — v4 placeholders reviewed
  • GATE DTF sample wash-test day-3 inspection (100% of samples — any crack = vendor swap)
  • MILESTONE First production-run order placed if quotes + samples pass gates
T-14
2026-04-29 Wed
ACTIVE
  • ACTION Production-run target quantity confirmed per SKU (drives blank reorder if needed)
  • ACTION Photography art-direction prep — Code 7: calm intimacy register
T-13
2026-04-30 Thu
ACTIVE
  • ARTIFACT Photography re-shoot Day 1 — hero SKUs (Return Tee, Always Tee, Heritage Patch)
T-12
2026-05-01 Fri
ACTIVE
  • ARTIFACT Photography re-shoot Day 2 — Summer Body Tank + DTF Motif 02
  • MILESTONE Noissue packaging arrives (MOQ 250 kraft mailer + tissue + sticker + stamp)
T-11
2026-05-02 Sat
ACTIVE
  • ARTIFACT Photography selects — 2-day post-shoot turnaround per canon
  • ARTIFACT PDP hero composites rebuilt from final selects (5 SKUs × ≥3 angles)
T-10 · T-9 · T-8
2026-05-03 Sun — 2026-05-05 Tue
ACTIVE
  • ARTIFACT Production decoration runs — screen print SKU-1, DTF SKUs 3/4/5
  • ARTIFACT Woven neck label sewing + care label attach
  • GATE QA station — dE ≤3.0 color check, placement ±3mm, 25-wash durability sample pull

Phase 3 · SOU Specimen + Launch Prep

CRITICAL
T-7
2026-05-06 Wed
CRITICAL
  • GATE SOU specimen requirements re-verify with Venable LLP — Class 35 specimen rules
  • ARTIFACT E-commerce specimen screenshots prepared (editorial gallery + functional pre-order)
  • GATE Teaser → apex swap rehearsal: teaser.revasser.nyc ↔ revasser.nyc
T-6 · T-5
2026-05-07 Thu — 2026-05-08 Fri
CRITICAL
  • MILESTONE Final production pieces arrive at operator location
  • GATE Genuine-sale test checkout — operator places one order on production page
  • ARTIFACT First shipped unit photographed in packaging (SOU specimen candidate)
T-4 · T-3
2026-05-09 Sat — 2026-05-10 Sun
CRITICAL
  • ARTIFACT Launch-page copy finalized (PDP-01 through PDP-05, pricing locked)
  • ARTIFACT Packaging assembly — kraft mailer + tissue + olive-ink Ř stamp + sticker bundle
  • GATE Legal review — last pass with Venable on specimen sufficiency
T-2 · T-1
2026-05-11 Mon — 2026-05-12 Tue
CRITICAL
  • MILESTONE Apex DNS cutover: revasser.nyc → rc01-teaser / production site
  • ARTIFACT Launch email sequence queued (Klaviyo or equivalent)
  • GATE Final site smoke-test — checkout, SSL, Cloudflare Worker fan-out, all 5 PDPs live
T-0 · LAUNCH
2026-05-13 Wed
LAUNCH
  • MILESTONE SOU specimen filing window OPEN — upload evidence to USPTO
  • MILESTONE Launch email sends 9:00 AM ET
  • MILESTONE First public sale captures SOU specimen timestamp
  • MILESTONE Class 35 SOU specimen filed with Venable LLP oversight

Phase 4 · Post-Launch

POST-LAUNCH
T+1 · T+2 · T+3
2026-05-14 Thu — 2026-05-16 Sat
POST-LAUNCH
  • GATE SOU filing confirmation from USPTO (typical 2-4 business day ack)
  • ACTION Order fulfillment — first batch shipped within 48h of order
  • ACTION Customer feedback capture — fit, print durability, photography accuracy
T+4 → T+7
2026-05-17 Sun — 2026-05-20 Wed
POST-LAUNCH
  • MILESTONE RC02 kickoff — learnings docket, SKU matrix v2, next capsule window
  • DECISION Remaining inventory disposition — restock decision or made-to-order lane

Per-SKU status

Five SKUs, single Obsidian Pearl colorway, launch 2026-05-13. Register per axiom D-001: garment ground #131315, print hero pearl #E8E4DF, accent warm off-white #F5EFE8. Blended margin target: ~83% at midpoint retail.

SKU Blank Decoration Primary Vendor Status Retail Risk
SKU-1 Always Tee · Wordmark AS Colour 5080 Pearl screen print chest wordmark + RR nape monogram Print Positiv (primary) / Shirtmax blanks ART LOCKED $115 low
SKU-2 Summer Body Tank BC 3483 Nape ê + chest-pocket wordmark DTF (Option C, pending Decision 2) DTF Transfers Now / Shirtmax blanks DECISION OPEN $85 low
SKU-3 DTF Motif 01 · HP-1 Reversed R AS Colour 5080 Full-chest DTF soft-hand matte — IMG_1675 hand-painted DTF Transfers Now ART LOCKED $125 medium (DTF adhesion)
SKU-4 DTF Motif 02 · HP-3 Deconstructed AS Colour 5080 Scattered DTF — IMG_1673 chest + back cluster DTF Transfers Now ART LOCKED $125 medium (DTF adhesion)
SKU-5 Heritage Patch AS Colour 5080 Woven patch upper-chest-left (NY Custom Labels) — Option A pending Decision 1 + execution method NY Custom Labels (woven) / DTF Transfers Now (fallback) DECISION OPEN $125 low if woven / medium if DTF

Launch gates · Pass/fail rubric

Ten gates. Seven blockers (must pass before launch), two warn (missing is survivable but not ideal), one launch-tier (ship day only). A single blocker failure delays launch. Warn failures get a post-launch punch list.

Gate Pass criteria Tier
G1 · Decision pack resolved All 4 operator decisions committed (SKU-5 art, SKU-2 deco, DNS, vendor orders) BLOCKER
G2 · Blanks in inventory LA Apparel 34008GD + 3380GD arrived + Shirtmax AS5080 + BC3483 confirmed BLOCKER
G3 · Print samples pass Print Positiv discharge sample + DTF 30-wash test + (optional) woven patch sample all pass BLOCKER
G4 · Production-run quotes Shirtmax + decoration vendor quotes returned · unit-economics COGS populated · margin > 70% confirmed BLOCKER
G5 · Photography complete Pre-shoot composite v4 OR May-2 re-shoot selects delivered · 5 SKUs × ≥3 angles each BLOCKER
G6 · SOU specimen ready E-commerce specimen per Venable LLP — editorial gallery + functional pre-order · genuine-sale test passed · Class 35 requirements re-verified BLOCKER
G7 · Packaging arrived Noissue MOQ 250 kraft mailer + tissue + stamp · olive-ink Ř stamp tested WARN
G8 · Site + DNS hot revasser.nyc apex cut over · 5 PDPs live · Cloudflare Worker fan-out verified · SSL + CSP clean BLOCKER
G9 · Launch email queued Klaviyo sequence · 9 AM ET send time · waitlist + pre-launch subscribers segmented WARN
G10 · Legal final pass Venable specimen review signed off · trademark filing materials staged · SOU upload rehearsed BLOCKER

Companion artifacts

Execution depends on these living documents. Each is the source of truth for its slice.

Provenance. This runbook is derived from living canon — docs/production-dossier-rc01.md, public/rc01-deliverables/production-playbook.md, state/axioms/revasser-rc01-5sku.md, and the 2026-04-19 decision-pack + vendor-call-list. Dates are absolute. Gate criteria are derived from production-playbook QA rubrics and SOU specimen requirements confirmed with Venable LLP. When a future date conflicts with this runbook, the live operator record wins — this page is a snapshot generated 2026-04-19 and should be regenerated from source when decisions close.

Launch clock: Wednesday 2026-05-13 09:00 ET. That is when the SOU filing window opens for Class 35 App 98/449,520. Every blocker on this page flows back to that timestamp.